The Millau Viaduct in southern France is the world’s tallest cable-stayed bridge, spanning 2,460 metres and rising 343 metres above the Tarn River Valley, connecting Clermont-Ferrand and Béziers.
The total construction cost of the Viaduc de Millau was approximately €394 million (roughly $424 million USD).
The bridge, designed by structural engineer Michel Virlogeux and architect Norman Foster, seamlessly integrates architecture and natural surroundings.
The key engineering problem was to ensure structural stability in the midst of wind and seismic forces. To solve this, the team designed the bridge to be flexible, aerodynamically efficient, and environmentally friendly. This results in a structurally strong and visually appealing bridge that serves as an important transportation link between Paris and the Mediterranean coast.
MEGA PROJECTS WANTED, $20,000,000. to $500 BILLION & Shovel Ready!!
ANY PURPOSE LOANS. USA, CANADA, CENTRAL AMERICA, INTER-NATIONAL.
2. Jet, Ethanol, Bio Butanol, Power Plants, Hydro, Thermal, Wind, Solar, Casino, Real Estate, Hotel, Motel, Mixed Use, Advanced Materials, Agriculture, Alternate Energy, Artificial Intelligence, Biopharmaceutical, Clean Tech, Communication, Components, Defense, Digital
3. Media, E Commerce, Electronics, Energy, Engineering, Entertainments, Environmental, Financial Technology, Government, Health Care , Health Care Services, Infrastructure, Insurance, Internet, IT Life Sciences, Media, Medical Devices & Instruments, Mobile, Nanotechnology, Networking, Real Estate, Robotics, Security, Semiconductors, Software, Storage, Telecom, Transportation, Wireless
Call Us With Any Viable Project
In all cases, the Promoter must cover the running costs prior to obtaining a construction permit. These costs will be considered the contribution of the Promoter to the Project. The cost of land or obtaining rights to it is also paid by the Promoter.
It is supposed to study which option is most convenient for the Promoter in each case.
3. A flexible combination of Bank Financing and contributions from Financial Investors is proposed for the period of construction and at least 15 years of operation of the facility, replacing the traditional Project Financing.
SPV will be created only for the construction of the project in which the loan guarantor will have a majority stake only during the construction period. The necessary credit will be insured by external guarantees in such a way that the Promoters Bank will have no problem in financing the construction.
At the end of the Construction the Assets will be acquired by an Investor who will receive an annual income for at least 15 years, giving the option to buy back the Asset to the Operating Company. The future annual income of the Investor must have a guarantee from the Operators Bank.
MY LENDERS DO NOT FUND "PAYDAY " Loans for $250-$300 K,(.... OR 'LIL JOHNNIES
Lemonade Stand!